Logo

FOUND Excellent Machine Shop in NJ

knuckle47

Advanced Contributor
"I hate to advertise anyone an

"I hate to advertise anyone and IF THIS IS AGAINST FORUM POLICY: PLEASE DELETE.

On the other hand, I had to have my other engines' cylinder heads done with a new valve job and my previous experience was less than nice. It took 6 weeks to get them back and while it was a good job, blah blah AND it was January so I didn't really care about the time....etc

I had seen the facility on the web and thought I would go here IF I EVER needed to do that again...Eddies Valve Grinding in Sayreville took my heads Tuesday late afternoon and returned them to me Thursday morning having done the MOST SPECTACULAR job I have seen since my last vintage motorcycle engine back in 1998. He fly cut the mating surface of the head gaskets, check the valves with that red dye and set eveything up so nicely that all I need to do is carry them to the boat and install. I am SO IMPRESSED and pleased that IF IT WAS AN EASY THING TO DO..... I would remove the other new side and re-do it ,( yeah sure). Very Pleased and I can't wait to get it running SATURDAY !!!!!"
 
"Thanks for the advice,Al.Neve

"Thanks for the advice,Al.Never know when father time tells me its my time to see the insides of my engines as well.I have been away on the boat a week and have been wondering how you are making out,Al.....Todd"
 
"Thanks Todd....A WEEK? Great

"Thanks Todd....A WEEK? Great...I would love to do that sometime. Actually, I had a bit of weakness in my arm where I fell off of the swim platform a few weeks back and I did not have it in me to carry the other head back onto the boat. But it is all done now and I am probably going to have it running Tuesday 6/3....I 'll let you know how it runs.."
 
Back
Top