hey guys
i have made a few posts about this water pipe already so hopefully this is the last one. i had a few troubles trying to remove the upper water tube grommet which eventually led to the old pipe breaking. i finally removed the old grommet and have now installed the new one. now the new water pipe has finally arrived but i can not seem to get it deep into the grommet. i assume the correct order of install would be to firstly install the grommet and then push the new pipe through the grommet.
i have pushed about as hard as i am comfortable doing and feel like if i push any harder the pipe will probably bend. I basically wanted to check if i am missing something or if there is something i should do differently.
thanks for any help
i have made a few posts about this water pipe already so hopefully this is the last one. i had a few troubles trying to remove the upper water tube grommet which eventually led to the old pipe breaking. i finally removed the old grommet and have now installed the new one. now the new water pipe has finally arrived but i can not seem to get it deep into the grommet. i assume the correct order of install would be to firstly install the grommet and then push the new pipe through the grommet.
i have pushed about as hard as i am comfortable doing and feel like if i push any harder the pipe will probably bend. I basically wanted to check if i am missing something or if there is something i should do differently.
thanks for any help

