goodforbrains
New member
Hi! I have a 2001 tlrz 130. I just replaced the oil injection pump and all of the oil injection lines. Also replaced the adjustable link joint. I am trying to set the injection pump to spec and I think the factory manual explains this procedure pretty poorly. I am looking for some guru knowledge here! The manual states to disconnect the oil pump rod and fully close the throttle valves. Move oil pump lever fully closed against the stop. Adjust the link rod until the link joint hole aligns with the set pin on the lever. Pop the link joint on, tighten lock nut and put the washer and retaining clip back on. Ok, this is easy enough right? So now we know what the NO (closed) throttle setting is, but how about the FULL (WOT) throttle setting? When I advance my throttle to Wide Open, my injection pump doesn't hit the fully open stop. The lever is about 3/4th the way to the fully open stop. I'm thinking the lever should hit the fully open stop when the throttle is advanced to fully on. Other Yamaha service manuals (2006 200 HDPI) say that the injection pump lever should hit the fully open stop at WOT. So what gives with my manual and procedure? The only reference to the fully open oil pump lever is when you pop the rod off to do the volumetric test. It wants you to do the volumetric test with the oil pump lever fully open, but makes no mention of the required position of the pump lever at WOT for normal operating conditions. I just purchased my manual from this website in the summer, so I'm pretty sure that it is the correct one #lit-18616-02-03 So if any of you experienced people could give me any insight here, I would be very grateful! Thanks a lot and Happy New Year! Brian