sabrepsycho
New member
I am not sure how many turns I'm supposed thread the carrier bearing assembly back into the lower unit. the seloc manual states there is no specific amount of turns and that it's a trial and error thing. so I need to know how I test it and if i install it while the shift shaft is in neutral.